01Flange Management
Bolt flange management has been a major way to help reduce leakage and emissions. At Sinosmart Company, we strive to achieve highly secure and leak-free joints to reduce costs and improve system uptime While improving health, safety and environmental quality standards. Therefore, allowing us to provide a leak-free guarantee, To reduce customer costs. The process requires precise data to provide complete traceability, taking into account details such as flange type, gasket type, bolt and nut material, lubricant coefficient as well as multi-tool bolt and flange stress calculations, joint history, linking, electronic work package registration and report generation. These technical data are adhered to during operation to reduce downtime and thus improve efficiency during the construction phase.
02Pipe Drying
Our engineering experts will blow the system using a rapid decompression method to achieve the desired cleanliness and correct dryness
03Density test
With advanced equipment to prevent the pipeline or pressure vessel leakage to carry out the pressure medium for gas tightness test
04Pass the ball experiment
Our technicians are skilled in using ball-through equipment to detect pipes and prevent clogging
05PSV calibration
Our advanced safety valve testing equipment can be used for direct load type and pilot type safety valve setting pressure, seat pressure and sealing performance tests